Your cart is currently empty!
On Tuesday (9/24/02) I laid out the supports for this 6′ x 5′ platform (using pressure-treated 2x4s, pre-cut to size at Lowe’s):
After screwing the boards together (using 2.5″ galvanized screws) I attached the 3/4″ plywood floor:
Then I raised the platform by setting it on the concrete deck blocks — probably easier with two people, but I managed to Philip-handle the very heavy box on top of the blocks:
So this is the elevated platform (some 9″ off the basement floor, yet enough headroom for 6’4″ me to stand on it):
Leave a Reply